[ 
https://issues.apache.org/jira/browse/GROOVY-9671?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Paul King resolved GROOVY-9671.
-------------------------------
    Resolution: Fixed

Proposed PR merged.

> Absorb GContracts project into Groovy project
> ---------------------------------------------
>
>                 Key: GROOVY-9671
>                 URL: https://issues.apache.org/jira/browse/GROOVY-9671
>             Project: Groovy
>          Issue Type: New Feature
>            Reporter: Paul King
>            Assignee: Paul King
>            Priority: Major
>             Fix For: 4.0.0-alpha-1
>
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> The GContracts project (design-by-contract extension for Groovy) has been 
> archived:
> https://github.com/andresteingress/gcontracts/
> This issue is to consider absorbing it into the Groovy project.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to