Schumann Ye created OFBIZ-10388:
-----------------------------------

             Summary: Production Run is not created after MRP run.
                 Key: OFBIZ-10388
                 URL: https://issues.apache.org/jira/browse/OFBIZ-10388
             Project: OFBiz
          Issue Type: Bug
          Components: manufacturing
    Affects Versions: 16.11.04
         Environment: OS: Windows Server 2008 R2

Database: MySQL 5.7

JDK: 1.8.0_131
            Reporter: Schumann Ye
         Attachments: mrp_result.PNG

I have done the following:

1. I created a finished goods (with BOM) with 3 raw materials.
2. Routings tasks & routings and product linkage are all done correctly;
3. When the requirement method id of the product is set to "When QOH reaches 
minimum stock for Product-Facility" and minimum stock of  the product facility 
is maintained with a certain figure, after MRP is run, I have got the expected 
Production Run.



Here below is where I don't understand:

4. After successfully creating a sales order with the product requirement (30 
pcs), I can see the total ATP becomes negative figure (e.g. -30) because I 
don't have enough stock to cover the needed quantity required by the created 
sales order.

5. Then I go to Manufacturing to check MRP running result, it shows me only the 
proposed manufacturing order receipt with 5 pcs (as set in the minimum stock) 
as shown in the attached png file. 

6. My question is, where is the expected 30 pcs with the expected production 
run?

P.S.: I have also tried every single sort of requirement method id in the 
Catalog-Product-Inventory but it simply did not work as expected.

Pls help.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to