[ 
https://issues.apache.org/jira/browse/OFBIZ-13248?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17983628#comment-17983628
 ] 

Jacopo Cappellato commented on OFBIZ-13248:
-------------------------------------------

This seems a valid requirement. Please, consider the following type for 
implementation 
 
costComponentTypeId: "LABOR_COST"

> Labor costs are missing from cost calculations in the Manufacturing module, 
> leading to incomplete production run accounting.
> ----------------------------------------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-13248
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-13248
>             Project: OFBiz
>          Issue Type: Improvement
>          Components: manufacturing
>    Affects Versions: Upcoming Branch
>            Reporter: Yashwant Dhakad
>            Priority: Minor
>
> In the Manufacturing module, during cost calculation, labor costs are not 
> included or recorded for respective production runs, even though features to 
> record the workers’ hourly rates and logged hours are available. This 
> omission of labourer’s wages from the final cost calculation, results in 
> incomplete cost reporting, as labor expenses are missing from the “Actual 
> Costs” section of production run’s respective routing tasks. To address this, 
> the system should:
>  * Calculate labor costs by multiplying the worker’s hourly rate by their 
> logged hours.
>  * Record these costs as a labor cost entry in the production run’s cost 
> records.
>  * Include labor costs in the total production run cost displayed in the 
> Manufacturing module.
> These changes will ensure accurate cost reporting, improve financial 
> analysis, and eliminate manual calculations.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to