abhinav-phi commented on PR #44212:
URL: https://github.com/apache/superset/pull/44212#issuecomment-5688567624

   Rebased onto current `master` (`4c27cbd`) — thanks for merging #44288! 🎉
   
   Since the merge revision is now upstream, the interim no-op merge-revision 
commit on this branch was dropped automatically during the rebase ("skipped 
previously applied commit"), so this PR is back to a single frontend-only 
commit: the `smart_date_verbose` year fix with tests, nothing else.
   
   `git merge-tree` of the branch against `master` resolves to exactly one 
Alembic head (`e2f3a1b9c640`), and the earlier run already showed the whole 
frontend side green on this exact change (all 8 sharded jest suites, 
lint-frontend, tsc, pre-commit, test-storybook, bundle-size), so the cancelled 
runs should replay green here.
   
   One data point for whoever looks next: in the cancelled attempt the 
`docker-build (superset)` job had failed at ~18:44Z *after* the merge-head fix 
was already in the merge commit, so that one may be unrelated to the Alembic 
issue (build-time failure) — worth a look if it reappears. Everything that 
failed in the last wave shows `cancelled` rather than a real failure.
   
   Could someone approve and run the new workflow set? The PR should then be 
fully green and ready for review.


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]


---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to