aozmekik commented on PR #45741: URL: https://github.com/apache/superset/pull/45741#issuecomment-6448060459
Had a look. I don't think the .po file is the problem, it's the baseline. The failing runs checked out a tree from before this PR, but the job fetches master when it starts, and by then master was f93aa5b (this PR). So the 196 entries this PR de-fuzzed look like they were invalidated by the PR under test. The push run for ff0af9c and the runs for #45709 and #45640 all show `HEAD is now at f93aa5b` in the fetch step and `tr: 196` at the end, and 196 is exactly how many fuzzy flags this PR removed. Re-running won't help because the merge ref doesn't change, but a new push to those branches will. I opened #45794 to take the baseline from the parent of the checked-out commit instead of the branch tip. -- This is an automated message from the Apache Git Service. To respond to the message, please log on to GitHub and use the URL above to go to the specific comment. To unsubscribe, e-mail: [email protected] For queries about this service, please contact Infrastructure at: [email protected] --------------------------------------------------------------------- To unsubscribe, e-mail: [email protected] For additional commands, e-mail: [email protected]
