http://www.world-nuclear-news.org/RS_Hydrogen_solution_for_Japanese_reactors_1910121.html?goback=%2Egde_2990815_member_177966203


Hydrogen fix for Japanese reactors
19 October 2012
Areva has a bulk order in Japan to fit hydrogen recombiners that help to 
prevent the explosive gas building up in reactor containment during emergency 
situations.
The French company announced a contract to provide its passive autocatalytic 
recombiners. The devices use catalytic oxidation to turn traces of hydrogen 
into steam, a process that works constantly and requires no power. They will be 
fitted in the reactor unit containment vessels to help prevent hydrogen 
explosions and "preserve the integrity of the reactor," said Areva.
Many nuclear operators installed systems to manage hydrogen after the partial 
core melt at Three Mile Island in 1979. Unfortunately, the course of action 
chosen by Tokyo Electric Power Corporation was to fit versions that required 
power. During the accident at Fukushima Daiichi last year, many hours without 
power for cooling water pumps saw nuclear fuel in the cores of units 1, 2 and 3 
overheat to the point that zirconium fuel cladding oxidised in the presence of 
steam, producing hydrogen and oxygen. At units 1 and 3 this was able to escape 
the containment and concentrate in the tops of the buildings, where it 
eventually exploded and caused extensive physical damage to those units as well 
as unit 4. While Tepco's hydrogen management was inactive due to the loss of 
power, the passage of hydrogen to the top of the building was another 
unexpected aspect of the accident sequence.
Areva said it will install 100 of its devices at various Japanese reactors, 
without specifying which units.
Researched and written
by World Nuclear News


























 

Raspunde prin e-mail lui