Hi, I have Eaton 3S 700 connected and configure using nut-2.8.0 under ArchLinux. OL, OB reporting works OK, but I am not able to enable battery testing. Variables ups.test.* are not reported by upsc:
[root@black ~]# upsc [email protected] |grep ups.* device.type: ups driver.name: usbhid-ups ups.beeper.status: enabled ups.delay.shutdown: 360 ups.delay.start: 120 ups.firmware: 02 ups.load: 5 ups.mfr: EATON ups.model: Eaton 3S 700 ups.power.nominal: 700 ups.productid: ffff ups.realpower: 28 ups.serial: 000000000 ups.status: OL ups.timer.shutdown: -1 ups.timer.start: -1 ups.vendorid: 0463 Recently I had to replace battery and when using official Eaton UPS Companion 2.1 under windows7, I see "battery testing" option and I can choose battery test period (every day, every week, etc). Is there any way I can enable battery testing with nut for this model? Thanks, Łukasz _______________________________________________ Nut-upsuser mailing list [email protected] https://alioth-lists.debian.net/cgi-bin/mailman/listinfo/nut-upsuser
