NWAM West: 9AM Menlo Park/12PM Burlington/5PM Dublin

Attendees: Darren, Alan, Steff, Karen, Anurag, Victor, Erik, Jim, Renee 

1. Phase 0.5/picea status
   * Demo for Tim and Greg went well yesterday, thanks to everyone for all
     the work that went into preparing for that.
   * Darren and Jim both working on testing and bug-fixing.
   * Docs: Steff reviewed the GUI man page, sent feedback to Darren; Jim
     will check existing nwmad(1M) man page to see if updates are needed.
     Probably minimally need a reference to the GUI.

2. Phase 1 status
   * Alan: ND1b and ND2 (daemon--hotplug sysevents, modularize event sources)
     about ready to push; probably won't do code review at this point, as the
     task divisions make for somewhat incomplete work.
   * Anurag: wrapping up nwamcfg and looking at libinetcfg.
   * Renee: doc work moving very slowly, need to get caught up.
   * Overall p1 schedule: looks pretty stable now.  Remaining area for review
     is the QE sections; will discuss in NWAM East meeting.


NWAM East: 6PM Menlo Park/9AM Beijing

Attendees: Karen, Lizhong, Alex, John, Victor, Renee

Reviewed items from earlier meeting; see notes above.

Phase 1 schedule update: We need to review the test development tasks on
the schedule in light of the team staffing changes; bringing a new team
member up to speed will have impact, and we need to figure out exactly
where we are now and what the impact will be.  Karen will revise schedule
with holiday/vacation info and send out tonight; Renee, John, Alex and
Lizhong will meet early next week to work out the details of the current
status and scheduled tasks.

-renee