NWAM West: 8:30AM MPK/11:30AM BUR/4:30PM DUB
Attendees: Michael, Darren, Alan, Steff, Karen, Victor, Anurag, Renee
1. Phase 1 status
* C-team checklist:
- Docs: Will have online help system for GUI, and will be covered in
Opensolaris System Administration Guide. Steff is doing both of
these doc components.
- Victor and Karen will work on accessibility form for CLI; there will
be a separate one for GUI. Will be complete end of this week.
- Localization: Need to complete work request for ON components. JDS
team will handle GUI component; Darren will find out if that includes
help text. Anurag will make sure appropriate text is wrapped in
gettext() and get estimate on line count.
* ON dev approaching complete.
* Will begin design review 1/26.
* GUI dev making good progress, but need nwamd to work with. Michael
will have something for them 1/19.
NWAM East: 5:00PM MPK/9:00AM BJS
Attendees: Victor, Eric, John, Alex, Lizhong, Renee
1. Phase 1 status
* Alex: Loc, NCP test dev nearly done, should finish this week; ENM tests
complete next week
* Lizhong: CLI tests on track to complete 2/9.
* John: Beginning on assertions for event tests. Thinking about manual
vs. automated testing; in order to automate much of this, the required
setup becomes very complicated and difficult to set up. If we had the
right tools, we could create automated tests that could run on a much
simpler setup. Will plan to do manual testing now for those assertions
that would require more than two machines for automated tests; will look
at development of the needed tool (a driver that could simulate a nic
under different conditions) and automated tests that build on that as a
post-integration effort. Possible cooperative effort with other teams
that could also use such a tool.
2. Travel to Menlo Park
* Alex won't be able to make it the week of 2/2; he'll hopefully be out
later in the month. John will confirm tomorrow regarding his travel.