Tomek Rękawek created OAK-4308:
----------------------------------

             Summary: Align the UpgradeTest#upgradeFrom10 to oak-segment-next
                 Key: OAK-4308
                 URL: https://issues.apache.org/jira/browse/OAK-4308
             Project: Jackrabbit Oak
          Issue Type: Task
          Components: jcr, segment-next
            Reporter: Tomek Rękawek
            Priority: Minor
             Fix For: 1.6


Test case {{UpgradeTest#upgradeFrom10}} in the {{oak-jcr}} module unpacks an 
archived TarMK repository in the Oak 1.0 format and tries to run the current 
oak-segment on top on that. It also validates whether all the data are in place.

This works, because the oak-segment code automatically detects the old 
repository format and upgrades it in-place, without any user action.

However, after changing this test to use the oak-segment-next it'll break, 
because the upgrade path for the new repository code is more complex - it 
requires invoking the oak-upgrade manually, to sidegrade the data (as in 
OAK-4260).

We should move this test to the oak-upgrade module and modify it a bit, so the 
data are sidegraded before the repository is validated.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to