[
https://issues.apache.org/jira/browse/OAK-5360?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Michael Dürig updated OAK-5360:
-------------------------------
Fix Version/s: (was: 1.7.11)
> Cancellation of gc should be reflected by RevisionGC.getRevisionGCStatus()
> --------------------------------------------------------------------------
>
> Key: OAK-5360
> URL: https://issues.apache.org/jira/browse/OAK-5360
> Project: Jackrabbit Oak
> Issue Type: Improvement
> Components: core, segment-tar
> Reporter: Michael Dürig
> Assignee: Michael Dürig
> Labels: gc, management, monitoring, production
> Fix For: 1.8
>
>
> Currently when a garbage collection cycle is cancelled from "within" (i.e.
> through {{CancelCompactionSupplier}} then this is not reflected through
> {{RevisionGC.getRevisionGCStatus()}} but rather reported as successful run.
> We should change this and return a failure result indication the cancellation
> so downstream consumers get an proper indication whether and which gc runs
> actually succeeded.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)