[ 
https://issues.apache.org/jira/browse/OAK-5360?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Davide Giannella updated OAK-5360:
----------------------------------
    Fix Version/s:     (was: 1.10.0)

> Cancellation of gc should be reflected by RevisionGC.getRevisionGCStatus()
> --------------------------------------------------------------------------
>
>                 Key: OAK-5360
>                 URL: https://issues.apache.org/jira/browse/OAK-5360
>             Project: Jackrabbit Oak
>          Issue Type: Improvement
>          Components: core, segment-tar
>            Reporter: Michael Dürig
>            Assignee: Michael Dürig
>            Priority: Major
>              Labels: gc, management, monitoring, production
>             Fix For: 1.12
>
>
> Currently when a garbage collection cycle is cancelled from "within" (i.e. 
> through {{CancelCompactionSupplier}} then this is not reflected through 
> {{RevisionGC.getRevisionGCStatus()}} but rather reported as successful run. 
> We should change this and return a failure result indication the cancellation 
> so downstream consumers get an proper indication whether and which gc runs 
> actually succeeded. 



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to