https://issues.apache.org/ooo/show_bug.cgi?id=120097

          Priority: P3
            Bug ID: 120097
          Assignee: [email protected]
           Summary: Grouped chart can not be refreshed timely while data
                    source is changed.
          Severity: normal
        Issue Type: DEFECT
    Classification: Application
                OS: All
          Reporter: [email protected]
          Hardware: All
            Status: UNCONFIRMED
           Version: AOO 3.4.0
         Component: editing
           Product: chart

Build info: AOO3.4.1_r1351960

Reproduce steps:
1. Input number in cells, create a chart (select numbers as data source,
Insert-> Chart, click Finish button).
2. Select the chart, Ctrl+C to copy it, click another cell, press Ctrl+V to
paste it.
3. Select the two chart (hold Shift key and click the two charts), right click
-> Group-> Group.
4. Modify one number in the data source.

Issue: 
Only the first chart can be refreshed timely. 
The second one has no changed, unless the screen repainted. For instance,
switch to another sheet then go back; or drag the scroll bar down to move the
chart out of screen, then up to show it again.

-- 
You are receiving this mail because:
You are the assignee for the bug.

Reply via email to