[ 
https://issues.apache.org/jira/browse/OOZIE-258?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Alejandro Abdelnur updated OOZIE-258:
-------------------------------------

    Fix Version/s: pre-Apache
    
> GH-361: Throttle coordinator action/workflow creation per coordinator job
> -------------------------------------------------------------------------
>
>                 Key: OOZIE-258
>                 URL: https://issues.apache.org/jira/browse/OOZIE-258
>             Project: Oozie
>          Issue Type: Bug
>            Reporter: Hadoop QA
>             Fix For: pre-Apache
>
>
> Currently, if there are thousands of eligible  coordinator actions  to be 
> created (e.g. catch-up mode) for one coordinator job, oozie creates all of 
> them once and overloading the system.
> This thing needs to be controlled and should only materialized X number of 
> active actions per coordinator job. The
> value of X should be configurable whether in oozie level or per job level 
> that needs to be decided. 
> In addition, there should be a way for customer to define the order by which 
> job creation should be followed.  For
> example, if there are 1000 actions ready to be created which X actions should 
> be created first. Such as FIFO or LIFO.
> This will definitely reduce the load on the internal queue.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: 
https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to