The discussion of authority control vendors reminds me that I don't have a solid grasp of authority record processing.

This is what I have been able to figure out. Let me know if I have made any incorrect assumptions.

Let's assume a 2.5 system.

Initial record loading

1. Authority records are loaded into the system.

2. The script authority_authority_linker.pl is run. This script links reference headings in authority records to main entry headings in other authority records.

3. The script authority_control_fields.pl is run. This script goes though each bib record and creates a $0 in any field with a matching authority record.

Does it matter what order this is done in?

Ongoing Processing

1. As new bibs are added to the database, run authority_control_fields.pl on the range of new bib id's.

2. As new authority records are added to the database, run authority_authority_linker.pl on the range of new authority record id's.

Do old bib records ever need to be run through authority_control_fields.pl again? What if they are updated? What if they are overlaid via vandelay? Is there ever a circumstance where a new or updated authority record now matches old bibs? How would you identify the bibs, or do you have to run authority_control_fields.pl through the bib database periodically?

--
Martha Driscoll
Systems Manager
North of Boston Library Exchange
Danvers, Massachusetts
www.noblenet.org

Reply via email to