I am thinking of a 2 node cluster that sync the disks via DRBD.
I have seen some articles about using multipath and 2 independent targets but have also seen generic problem descriptions of using multipath in the face of failures.
I was thinking of using a floating IP address for the target and using the clustering/HA glue to make it move between servers.
This would be the equivalent of resetting the target software. Does anyone have a handle on how the initiators will deal with this. Ideally in theory and practice. -- Alvin Starr || voice: (416)585-9971x690 Interlink Connectivity || fax: (416)585-9974 al...@iplink.net || -- You received this message because you are subscribed to the Google Groups "open-iscsi" group. To post to this group, send email to open-is...@googlegroups.com. To unsubscribe from this group, send email to open-iscsi+unsubscr...@googlegroups.com. For more options, visit this group at http://groups.google.com/group/open-iscsi?hl=en.