Our Client is looking for a QA Tester, kindly go through the requirement and
if you are comfortable please respond back to Ajay : - [email protected] 

 

 

ROLE   : Quality Tester

LOCATION    :  Brooklyn, NY  

DURATION: 36-60Months

 

INTERVIEW MODE: Face to Face Only

 

 

Assignment Start/End Date:  Approximately 8/18/14

 

Scheduled Work Hours:  7 hours paid, 1 hour lunch not paid, i.e  35 hours
paid per week 



 

PROJECT DESCRIPTION:  MIS is required to support the FIA initiative to
Re-Engineer the business processes at the more than 40 SNAP and Job center
locations. The mission is to develop a client self-directed service model
that would improve customer service while maintaining integrity, by
utilizing technology and simplifying existing business processes.

Tasks & Duties
.  Design, develop and execute test scripts.
.  Experience with Load testing using tools like QTP (Quality Test
Professional), Win Runner, Load Runner.
.  Ability to analyze results and find bottlenecks. Ability to create
"ad-hoc" tests to exploit areas of suspect performance.

.  Developed Test plan & Test case document, Perform Functional, Integration
& Regression.
.  Prepare load test plan develop and execute load test plan. Maintain and
update the test plan with tests in progress.
.  Define modular workflow to test integrated system. Prepare functional
test plan for overall functional testing.
.  Implement and monitor test plan to perform end to end functional testing.
.  Discuss the test outcomes with design and development teams.

 

 

Skill Required:-

1.       Design and develop functional work flow for test.

2.       Experience with Load testing using tools like QTP (Quality Test
Professional), Win Runner, Load Runner.

3.       Ability to analyze results and find bottlenecks.

4.       Ability to create "ad-hoc" tests to exploit areas of suspect
performance.

5.       Developed Test plan & Test case document, Perform Functional,
Integration & Regression.

6.       Prepare load test plan develop and execute load test plan.

7.       Maintain and update the test plan with tests in progress.

8.       Maintain and update the test plan with tests in progress.

9.       Discuss the test outcomes with design and development teams.

 

 

 

Thanks & Regards

Ajay Kumar | Technical Recruiter

 

Bara Infoware, Inc. | 8(a), SDB, 9001:2000 Certified

Direct:925-887-1332 ext-303 *:  <mailto:[email protected]>
[email protected]

Fax: 925-666-3550   <mailto:gtalk%[email protected]>
Gtalk:[email protected]

2678 Bishop Drive San Ramon, CA 94583

::  <http://www.barainfo.com/> http://www.barainfo.com  

 

-- 
You received this message because you are subscribed to the Google Groups "Open 
Source J2EE frameworks" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to 
[email protected].
Visit this group at http://groups.google.com/group/open-source-j2ee-frameworks.
For more options, visit https://groups.google.com/d/optout.

Reply via email to