int-smoke-oracle - Build # 83 - Fixed: Check console output at http://builds.openbravo.com/job/int-smoke-oracle/83/ to view the results.
Committers since last success: Changes for Build #81 Changes for Build #82 Changes for Build #83 Last 20 lines of the console output: [...truncated 4058 lines...] selenium.stop: [selenium-shutdown] Getting: http://localhost:4444/selenium-server/driver/?cmd=shutDownSeleniumServer [selenium-shutdown] To: /srv/hudson/workspace/int-smoke-oracle/SANDBOX/automation/2.50/last-results/int-smoke-oracle/logs/result.txt [selenium-shutdown] DGF Errors during shutdown are expected test.integration.erp.testsuites.smoke.accountingprocess: test.integration.smoke: BUILD SUCCESSFUL Total time: 158 minutes 1 second + cp /etc/hosts.bak /etc/hosts [locks-and-latches] Releasing all the locks [locks-and-latches] All the locks released Recording test results Email was triggered for: Fixed Trigger Success was overridden by another trigger and will not send an email. Sending email for trigger: Fixed ------------------------------------------------------------------------------ ThinkGeek and WIRED's GeekDad team up for the Ultimate GeekDad Father's Day Giveaway. ONE MASSIVE PRIZE to the lucky parental unit. See the prize list and enter to win: http://p.sf.net/sfu/thinkgeek-promo _______________________________________________ Openbravo-builds mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/openbravo-builds
