Thanks for your reply. The objects I'm using are:

Pick -> Extract -> Compute -> Select -> Streamline

All the data I'm using are 2-D, but I still can get the streamline. If I
input the starting point directly in the configure control, then it works
correctly. Pick returns a 3-D vector, we can't get the correct 2-D vector
from this 3-D vector, is that right? Thanks.

yuzhong

>
> Compute does convert a 3-vector [a.x, a.y, a.z] to 2-vector with an
> expression like:
> [a.x, a.y]
>
> but it isn't accurate to say it extracts the vector. More precisely that
> implies to me that you extract a vector object (array) out of the field
> component in which the vector is embedded (the Pick structure). In fact,
> Compute does not do this. To put it another way, if the field had a data
> component with 100 3-vectors, and you passed it through the above Compute
> you'd get out a field with a data component that had 100 2-vectors.
>
> If you read the help carefully for Streamline, it accepts a bare list
> (array) of vectors, including a single vector, or a geometric field. That
> means that it would use the "positions", not the "data" of the supplied
> field.
>
> Try simply entering (typing directly into the configuration dialog box) a
> 2-vector value as the "starting point" for Streamline, giving it a known
> good start value for your vector field and check that that works. Remember
> that this must be a single vector or list of vectors, not a field of
> vectors. Furthermore, the vector field you are trying to make a streamline
> through must have the same dimensionality as the space in which it is
> embedded.
>
> If you have a field of vectors that you want to be starting points, use
> Extract to get the vector component out of the field. This is an "array"
> that can be piped to Streamline start. Optionally, use Select(array,
index)
> where array is the thing you just Extracted, and index is a 0-based index
> into that array (only 1D). This should return a single vector which can be

> piped to Streamline start.
>
> If that doesn't work, check to see that the Streamline settings haven't
> been changed in some way that cause the streamline to terminate
immediately
> (or shoot out of the domain immediately).
>
> Chris Pelkie
> Vice President/Scientific Visualization Producer
> Conceptual Reality Presentations, Inc.
> 30 West Meadow Drive
> Ithaca, NY 14850
> [EMAIL PROTECTED]
> (607) 257-8335 or (607) 254-8794
>
>

Reply via email to