Thanks so much for helping! I have gotten the plot with the dots, but Construct gives me an error that my counts don't equal my positions. I have 8360 rows of data in my file, so that is the counts I used, but it doesn't seem to like that. I can tell I have a ways to go before I have this program mastered!!! Thanks, Fred
You're entering something like [45, 45] or whatever factors to 8360 for counts, right?
-- Chris Pelkie Vice President/Scientific Visualization Producer Conceptual Reality Presentations, Inc. 30 West Meadow Drive Ithaca, NY 14850 [EMAIL PROTECTED]
