Hello,

Kirkstone is not EOL yet, but it's just a very few weeks away.

Wanted to tell about my plans ahead of time, in the hope that it will be
useful for some of you:

- Have one more regular PR, around the end of March, about a week before
the last scheduled Yocto release would be built[1]. Until that, it's
business as usual. Please keep sending your patches, I will send mine too.
- After that I plan to slow down with sending Kirkstone patches from my side
- However I will still keep my test/build environment for 1 week after
the last Yocto Kirkstone release or until Wrynose is released[2], and in
this period I plan to keep accepting contributions to Kirkstone meta-oe.
- If there are any final patches arriving, I will test them and prepare
a PR that's intended to be the very last PR.
- If no patches arrive in that period, then there won't be a new PR
- 1 week after the last Yocto Kirkstone release (or after Wrynose), and
after the optional last PR I plan to drop my Kirkstone build environment
- After this Kirkstone branch will be final, EOL and abandoned - all
remaining bugs will be promoted into features. Patches arriving after
this point will not be processed for this branch.

Nothing is carved into stone - if you'd like to change anything of the
above, or have any questions or comments, just reply to this message.
If no one speaks up, I will consider that everyone is happy with this.

Thank you,
Gyorgy

[1]: The last Kirkstone Yocto release is planned to be built on 6th, and
released on the 17th of April.
[2]: Whichever comes later.
-=-=-=-=-=-=-=-=-=-=-=-
Links: You receive all messages sent to this group.
View/Reply Online (#124804): 
https://lists.openembedded.org/g/openembedded-devel/message/124804
Mute This Topic: https://lists.openembedded.org/mt/118090078/21656
Group Owner: [email protected]
Unsubscribe: https://lists.openembedded.org/g/openembedded-devel/unsub 
[[email protected]]
-=-=-=-=-=-=-=-=-=-=-=-

Reply via email to