Public bug reported:

Hello everybody,

I want to use the production lot traceability for tracking my product in the 
manufacturing chain.
When I test this feature i have a problem:

- Go on the runbot and launch a OpenERP 7 instance (build 28645)
- Allow the admin user to track serial number (Manage Serial Numbers and Manage 
Logistic Serial Numbers)
- Allow to track manufacturing lot on "computer case" product (Track 
Manufacturing Lots).
- Create a Manufacturing Order with one Computer Case to product.
- Confirm the production and add serial number on products consummed and 
product finished.
- go on the production lot of finished product and click "upstream traceability"

The result:
http://tof.canardpc.com/preview/542fdde0-e9c1-4afc-ae8a-a57b561f58e6.jpg

I expected to see the final product with the three products used for
manufacturing it and i only have one product.

The traceability is broken in 7.0 ?
There is something i'm doing wrong?

** Affects: openobject-addons
     Importance: Undecided
         Status: New

** Attachment added: "Results"
   https://bugs.launchpad.net/bugs/1273267/+attachment/3959208/+files/31.png

** Description changed:

  Hello everybody,
  
- I want to use the production lot traceability for tracking my product in the 
manufacturing chain. 
+ I want to use the production lot traceability for tracking my product in the 
manufacturing chain.
  When I test this feature i have a problem:
  
  - Go on the runbot and launch a OpenERP 7 instance (build 28645)
  - Allow the admin user to track serial number (Manage Serial Numbers and 
Manage Logistic Serial Numbers)
  - Allow to track manufacturing lot on "computer case" product (Track 
Manufacturing Lots).
  - Create a Manufacturing Order with one Computer Case to product.
  - Confirm the production and add serial number on products consummed and 
product finished.
  - go on the production lot of finished product and click "upstream 
traceability"
  
  The result:
  http://tof.canardpc.com/preview/542fdde0-e9c1-4afc-ae8a-a57b561f58e6.jpg
  
+ I expected to see the final product with the three products used for
+ manufacturing it and i only have one product.
  
- I expected to see the final product with the three products used for 
manufacturing it and i only have one product.
- 
- The traceability is broken in 7.0 ? 
+ The traceability is broken in 7.0 ?
  There is something i'm doing wrong?

-- 
You received this bug notification because you are a member of OpenERP
Indian Team, which is subscribed to OpenERP Addons.
https://bugs.launchpad.net/bugs/1273267

Title:
  [7.0] Production lot traceability doesn't work correctly

Status in OpenERP Addons (modules):
  New

Bug description:
  Hello everybody,

  I want to use the production lot traceability for tracking my product in the 
manufacturing chain.
  When I test this feature i have a problem:

  - Go on the runbot and launch a OpenERP 7 instance (build 28645)
  - Allow the admin user to track serial number (Manage Serial Numbers and 
Manage Logistic Serial Numbers)
  - Allow to track manufacturing lot on "computer case" product (Track 
Manufacturing Lots).
  - Create a Manufacturing Order with one Computer Case to product.
  - Confirm the production and add serial number on products consummed and 
product finished.
  - go on the production lot of finished product and click "upstream 
traceability"

  The result:
  http://tof.canardpc.com/preview/542fdde0-e9c1-4afc-ae8a-a57b561f58e6.jpg

  I expected to see the final product with the three products used for
  manufacturing it and i only have one product.

  The traceability is broken in 7.0 ?
  There is something i'm doing wrong?

To manage notifications about this bug go to:
https://bugs.launchpad.net/openobject-addons/+bug/1273267/+subscriptions

_______________________________________________
Mailing list: https://launchpad.net/~openerp-india
Post to     : [email protected]
Unsubscribe : https://launchpad.net/~openerp-india
More help   : https://help.launchpad.net/ListHelp

Reply via email to