Yes prob. in two weeks :)
________________________________ Od: Abhijit Kumbhare <[email protected]> Odoslané: 16. marca 2017 17:51 Komu: Jozef Bacigál Kópia: [email protected]; Tomáš Slušný Predmet: Re: [openflowplugin-dev] OpenFlow Plugin Meeting Minutes/tasks March 16, 2017 Yes - there was :). I believe in Europe the daylight savings kicks in couple of weeks later. On Thu, Mar 16, 2017 at 9:47 AM, Jozef Bacigál <[email protected]<mailto:[email protected]>> wrote: We probably missed the meeting, was there a time change in US ? Jozef ________________________________ Od: Abhijit Kumbhare <[email protected]<mailto:[email protected]>> Odoslané: 16. marca 2017 16:46 Komu: [email protected]<mailto:[email protected]> Predmet: [openflowplugin-dev] OpenFlow Plugin Meeting Minutes/tasks March 16, 2017 Important tasks: 1. Split connection patches - need to expedite the patch 2. Cherry picking bug fixes from master to stable Boron. 3. Blocker bugs 4. Putting all Yang based config knobs into cfg file. Also match the names. 5. Clustering bugs in stable Boron - need to fix in the master. May need more than cherry pick 6. FRS related clustering fixes. Fixing bugs that were fixed for FRM for the FRS. 7. Backlog for the next release - stats manager verifier mode The optimization patch (https://git.opendaylight.org/gerrit/#/c/53368) - seems to be a high impact change - needs to be carefully tested.
_______________________________________________ openflowplugin-dev mailing list [email protected] https://lists.opendaylight.org/mailman/listinfo/openflowplugin-dev
