Yes prob. in two weeks :)

________________________________
Od: Abhijit Kumbhare <[email protected]>
Odoslané: 16. marca 2017 17:51
Komu: Jozef Bacigál
Kópia: [email protected]; Tomáš Slušný
Predmet: Re: [openflowplugin-dev] OpenFlow Plugin Meeting Minutes/tasks March 
16, 2017

Yes - there was :). I believe in Europe the daylight savings kicks in couple of 
weeks later.

On Thu, Mar 16, 2017 at 9:47 AM, Jozef Bacigál 
<[email protected]<mailto:[email protected]>> wrote:

We probably missed the meeting, was there a time change in US ?


Jozef

________________________________
Od: Abhijit Kumbhare <[email protected]<mailto:[email protected]>>
Odoslané: 16. marca 2017 16:46
Komu: 
[email protected]<mailto:[email protected]>
Predmet: [openflowplugin-dev] OpenFlow Plugin Meeting Minutes/tasks March 16, 
2017

Important tasks:

1. Split connection patches - need to expedite the patch
2. Cherry picking bug fixes from master to stable Boron.
3. Blocker bugs
4. Putting all Yang based config knobs into cfg file. Also match the names.
5. Clustering bugs in stable Boron - need to fix in the master. May need more 
than cherry pick
6. FRS related clustering fixes. Fixing bugs that were fixed for FRM for the 
FRS.
7. Backlog for the next release - stats manager verifier mode

The optimization patch (https://git.opendaylight.org/gerrit/#/c/53368) - seems 
to be a high impact change - needs to be carefully tested.

_______________________________________________
openflowplugin-dev mailing list
[email protected]
https://lists.opendaylight.org/mailman/listinfo/openflowplugin-dev

Reply via email to