On Tue, Sep 06, 2022 at 09:56:34AM +0200, Antonio Borneo wrote:
> The deadline for tagging v0.12.0-rc1, proposed for mid September, is
> approaching.  Nothing is fixed in stone, such a deadline is not a hard
> schedule, but I would like to respect it.  We already have 832 patches
> merged from the last v0.11.0 release (2021-03-07) and ~35 are in my
> local branch ready for merge in the next few days.

Yay! I've had to backport things to 0.11.0 for unstable Debian (for new
jimtcl and the libusb issue) and had been considering offering to do a
0.11.1 release if 0.12.0 had been derailed. Much happier with a proper
upstream release; if we can get an rc1 done this month I'll try to get
it uploaded to unstable ASAP for some extra testing.

J.

-- 
In God we trust; all else we walk through.

Reply via email to