- **status**: unassigned --> assigned
- **assigned_to**: Nagendra Kumar


---

** [tickets:#485] SU stuck in terminating state when being lock-in**

**Status:** assigned
**Created:** Fri Jul 05, 2013 10:38 AM UTC by Nagendra Kumar
**Last Updated:** Mon Jul 08, 2013 11:05 AM UTC
**Owner:** Nagendra Kumar

Test Steps:
1. 2N Red with 2 Sus(SU1 and SU2).
2. Configure 3 comp in each SU, 3 csi in each SI i.e. 3 SI. Each CSI/SI is for 
one component.
3. Add a new component in each SU.
4. Assign SI along csi.
5. Lock/lock-in, unlock-in. Su stuck in terminating.

Reason: When su fsm is running and it is termination all component, it see one 
component in uninstantiated state, it stuck there. 

More logs follows..


---

Sent from sourceforge.net because [email protected] is 
subscribed to https://sourceforge.net/p/opensaf/tickets/

To unsubscribe from further messages, a project admin can change settings at 
https://sourceforge.net/p/opensaf/admin/tickets/options.  Or, if this is a 
mailing list, you can unsubscribe from the mailing list.
------------------------------------------------------------------------------
This SF.net email is sponsored by Windows:

Build for Windows Store.

http://p.sf.net/sfu/windows-dev2dev
_______________________________________________
Opensaf-tickets mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/opensaf-tickets

Reply via email to