AMF PR doc changes in changeset:

changeset:   149:7db7d054b191
tag:         tip
parent:      146:f6b6282eb97e
user:        [email protected]
date:        Tue Apr 07 15:41:31 2015 +0530
summary:     amf: update for 4.6 release [#1169, #1158, #964, #1153, #1235]



---

** [tickets:#1235] NodeGroup shutdown Admin op to support parallel admin 
shutdown and admin lock on multiple nodes**

**Status:** fixed
**Milestone:** 4.6.FC
**Created:** Wed Dec 10, 2014 12:25 PM UTC by Mathi Naickan
**Last Updated:** Mon Mar 16, 2015 09:56 AM UTC
**Owner:** Praveen

Today, it is not possible to initiate AMF node shutdown operation on multiple 
nodes at the same time.

This ticket proposes (praveen's idea) to introduce a new AMF admin operation on 
the nodegroup logical entity.

A cluter scale-down usecase might introduce limits on the total time spent in 
down-sizing an AMF/application cluster. This enhancement shall look into 
different ways by which atleast some amount of parallelism is induced/pushing 
within AMF (wherever applicable) during the processing of this new 'node-group' 
shutdown operation.
End of the day, the final timetake will be a mix of 

1) amount of time spent in the checks inside AMF during processing of a 
parallel admin_op.
+
2) how quicky applications respond to the csi callbacks. 

Atleast to start with one redundancy model...
More later... Nagendra, Praveen would update on the details on the scenarios in 
which AMF would still continue to do serial processing i.e. where existing 
checks cannot be removed, etc....
(The bigger opportunity is also not to overlty complicate AMF by introducing 
this adminop)


---

Sent from sourceforge.net because [email protected] is 
subscribed to https://sourceforge.net/p/opensaf/tickets/

To unsubscribe from further messages, a project admin can change settings at 
https://sourceforge.net/p/opensaf/admin/tickets/options.  Or, if this is a 
mailing list, you can unsubscribe from the mailing list.
------------------------------------------------------------------------------
BPM Camp - Free Virtual Workshop May 6th at 10am PDT/1PM EDT
Develop your own process in accordance with the BPMN 2 standard
Learn Process modeling best practices with Bonita BPM through live exercises
http://www.bonitasoft.com/be-part-of-it/events/bpm-camp-virtual- event?utm_
source=Sourceforge_BPM_Camp_5_6_15&utm_medium=email&utm_campaign=VA_SF
_______________________________________________
Opensaf-tickets mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/opensaf-tickets

Reply via email to