Closing as approved. --Irene Irene Huang wrote: > Hi, all > > I am sponsoring this case. The timeout is set to be 06/24/2008 > XSane is targeting opensolaris 2008/11 (hopefully). > > Please review the attached proposal. > > --Irene
- Xsane [LSARC FastTrack 2008/385 timeout 06/24/2008] Irene Huang
- Xsane [LSARC FastTrack 2008/385 timeout 06/24/2008] Irene Huang
- Xsane [LSARC FastTrack 2008/385 timeout 06/24/2008] Irene Huang
