I am sponsoring this fasttrack for myself. Timer is set to 06/02/2010. Design document: materials/cong-design.pdf
(This case was initially filed as a full case, but at the inception meeting is was decided to convert it to a fasttrack, once the design has been reviewed by the networking group).
-Artem _______________________________________________ opensolaris-arc mailing list [email protected]
