Folks,

Okay, I haven't heard objections.

So I am going to make this all Project Private
and change the status to closed approved automatic.
The case, of course, will be remain as a reference
to be used when the FCoIB ULP case comes along
and a contract is put in place to use this stuff.

-ted

Ted H. Kim wrote:
okay picking up on this part of the thread ...

Alternatively, if these interfaces are really private between the IBTF,
hermon, and the FCoIB driver, then perhaps listing these changes
*briefly* in the FCoIB case (along with Consolidation or Project
Private) would have been better.  A lot of the detail could probably
then simply be elided instead of spelled out in excruciating detail
here.

It may be that my concerns here are entirely pedantic, and don't warrant
further consideration.

*Alternatively*, if you were to mark all these changes as Project
Private, then you could get this case closed easily without further
review.  You would then need to setup a contract between the FCoIB
project and this project.

Actually, what you say here makes a lot of sense, because the
FCoIB ULP driver is the only consumer for this API. These are not
generic operations even for other IB consumers.

Anyone else going to have a problem if I take this
project private and just do a contract with the FCoIB driver?


--
Ted H. Kim, PhD
Sun/Oracle America Inc.                 [email protected]
222 North Sepulveda Blvd., 10th Floor   (310) 341-1116
El Segundo, CA  90245                   (310) 341-1115 FAX
_______________________________________________
opensolaris-arc mailing list
[email protected]

Reply via email to