Hi, We had a strange issue today with that build which ended up being built from a merged node instead of the tip. The last 2 changeset in the tree are:
changeset: 13218:f687381cc6bc tag: tip parent: 13216:f6305a7f525c parent: 13217:3795a42120f6 user: Merov Linden <me...@lindenlab.com> date: Wed Oct 27 11:44:33 2010 -0700 summary: STORM-452 : merge with viewer-development changeset: 13217:3795a42120f6 parent: 13205:f40486111006 user: Andrew Productengine <adyu...@productengine.com> date: Wed Oct 27 19:23:52 2010 +0300 summary: STORM-452 FIXED Made protective fix for crash in LLAgentCamera::resetView(). I pushed those (and other changes) at the same time on the tree. Clearly, "f687381cc6bc" is the tip but TC picked up "3795a42120f6" instead and that ended up building things that were missing a day of merges. A bunch of JIRA thus have been failing QA and were back in the "To Do" swim lane. We do not know why TC did this but it's possible this is a rare "back to the future" issue: the time stamp for Andrew changeset is actually more recent than the timestamp of my merge thanks to our respective time zones. We suspect that this confused TC when picking up the repo. After consulting with hg/TC experts, we think that this was a "one off" occurrence because of me merging aggressively Andrew's changes right after they were done. I'm going to resume merging now and, hopefully, everything will be back to normal in the next build. Thanks for your attention and sorry for the confusion. Cheers, - Merov
_______________________________________________ Policies and (un)subscribe information available here: http://wiki.secondlife.com/wiki/OpenSource-Dev Please read the policies before posting to keep unmoderated posting privileges