We’re in the process of tearing down murano apps into separate production grade 
apps and murano-examples, that are only good as, well examples. So we do not 
intend to include murano-apps as a deliverable in this cycle. (Would probably 
need to update the release model for it as soon as possible next cycle)

-- 
Kirill Zaitsev
Murano Project Tech Lead
Software Engineer at
Mirantis, Inc

On 15 juillet 2016 at 16:38:06, Doug Hellmann ([email protected]) wrote:

We have a few deliverables without any milestone tags for this  
release cycle, yet (see the list below). They are at risk of being  
excluded from the final release for failing to prepare releases  
under the cycle-with-milestone release model.  

Please propose 0b2 tags by the end of the day, or let us know  
officially that you do not intend to include these deliverables  
this cycle.  

Thanks,  
Doug  

training-labs (Documentation)  
aodh (Telemetry)  
ceilometer (Telemetry)  
murano-apps (murano)  
trove-image-builder (trove)  

__________________________________________________________________________  
OpenStack Development Mailing List (not for usage questions)  
Unsubscribe: [email protected]?subject:unsubscribe  
http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev  

Attachment: signature.asc
Description: Message signed with OpenPGP using AMPGpg

__________________________________________________________________________
OpenStack Development Mailing List (not for usage questions)
Unsubscribe: [email protected]?subject:unsubscribe
http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-dev

Reply via email to