Looks good to me. On 9 January 2014 19:59, James E. Blair <[email protected]> wrote: > Hi, > > When Zuul gets very busy, it can end up launching hundreds of jobs > nearly simultaneously. Each of them has to perform several git fetch > operations to obtain the changes needed for testing. They fetch from > the git repos on the Zuul server because Zuul itself is creating those > commits by locally merging several changes together according to what's > in the queue. > > The acts of fetching and merging git patchsets (which is single > threaded) adds some load to the server, but in particular, serving those > git refs to 400 Jenkins nodes nearly simultaneously can also be a bit of > a burden. It was too much for our previous server; we've moved Zuul to > a faster server now, but it would be nice to have a more scalable > solution for the future. > > I'd like to move the Zuul git merging component into a separate process > that can be located on a separate host (or hosts) and scaled out. > > The current zuul-server would continue to manage the queue and launch > jobs, but as it processes the queue and decides which changes should be > composed and built into zuul git refs, it would package the info about > each ref and put it on the gearman queue as a work item. An instance of > the new component (zuul-merger) would fetch that job and fetch the > needed refs from Gerrit, and merge them. It would also serve the > resulting git repo in the same way that Zuul does now. > > Zuul would not have to wait for a response before continuing to process > the queue, and since it's not doing any actual work, will be able to > move through the queue _much_ faster than currently. Once Zuul _does_ > receive a completion response from a zuul-merger, it can then launch the > jobs for that change. It will pass the URL for that particular > zuul-merger (as ZUUL_URL) to the jobs so that they know from which > merger to fetch the zuul ref. We can also use the cancel job > functionality in gearman if Zuul decides to reorder the queue. > > We can scale out the mergers horizontally and they can operate in > parallel, which should also improve the responsiveness of overall queue > processing. > > The only downside I currently foresee is that if we scale out the > mergers too much, we will see a performance impact on gerrit; therefore > we should anticipate having a reasonably small number of these (2-8, > perhaps). > > Since this is already quite modular, I think the implementation should > be relatively simple. > > How does that sound? > > -Jim > > _______________________________________________ > OpenStack-Infra mailing list > [email protected] > http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-infra
-- Robert Collins <[email protected]> Distinguished Technologist HP Converged Cloud _______________________________________________ OpenStack-Infra mailing list [email protected] http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-infra