Thanks Joakim, good to know.

Karl

-----Original Message-----
From: Opm [mailto:[email protected]] On Behalf Of Joakim Hove
Sent: 07 April 2020 13:31
To: [email protected]
Subject: Re: [Opm] t=0 plotting in ResInsight

Sorry;


but opm/flow does not output any summary data for t=0. On the endless list ... 
:-)


Joakim

On 4/7/20 1:54 PM, Stephen, Karl D wrote:
> Hi,
> I tried to plot the early production data (WBHP) for a simulation. The data 
> are below as shown by ecl_summary.
>
> I used ResInsight to create a Summary Plot. The data for t=0 are not shown 
> below and the Summary Plot does not show it either. If I show the x-axis in 
> date format it is precise but missing the zeroth time step (on 1/1/20). When 
> I use "Time from simulation start", the time shows relative to the first time 
> step below so technically it is wrong by a day (zero on the axis corresponds 
> to the 1st day shown). The first day (2/1/20) shows as t=0.
>
> Do I need to ask for t=0 in flow or is there any other way round this?
>
> Regards,
>
> Karl
>
> -- Days   dd/mm/yyyy           WBHP:INJ        WBHP:PROD
> ---------------------------------------------------------
>     1.00   02/01/2020            4929.24           4017.9
>     4.00   05/01/2020            5039.81          3921.36
>    13.00   14/01/2020            5086.46          3886.24
>    40.00   10/02/2020            5092.44          3854.34
> 121.00   01/05/2020            4951.32          3765.44
> 200.00   19/07/2020            4813.99          3676.99
> 400.00   04/02/2021            4555.42          3458.61
> 600.00   23/08/2021             4357.4          3273.92
> 800.00   11/03/2022            4254.13          3165.94
> 1000.00   27/09/2022            4273.27          3171.96
> 1200.00   15/04/2023            4411.18          3305.55
> 1400.00   01/11/2023            4654.94          3558.35
> 1600.00   19/05/2024            4987.53           3917.4
> 1800.00   05/12/2024             5397.6          4350.39
> 2000.00   23/06/2025            5872.14          4845.02
> ________________________________
>
> Founded in 1821, Heriot-Watt is a leader in ideas and solutions. With 
> campuses and students across the entire globe we span the world, delivering 
> innovation and educational excellence in business, engineering, design and 
> the physical, social and life sciences. This email is generated from the 
> Heriot-Watt University Group, which includes:
>
>    1.  Heriot-Watt University, a Scottish charity registered under number 
> SC000278
>    2.  Heriot- Watt Services Limited (Oriam), Scotland's national performance 
> centre for sport. Heriot-Watt Services Limited is a private limited company 
> registered is Scotland with registered number SC271030 and registered office 
> at Research & Enterprise Services Heriot-Watt University, Riccarton, 
> Edinburgh, EH14 4AS.
>
> The contents (including any attachments) are confidential. If you are not the 
> intended recipient of this e-mail, any disclosure, copying, distribution or 
> use of its contents is strictly prohibited, and you should please notify the 
> sender immediately and then delete it (including any attachments) from your 
> system.
> _______________________________________________
> Opm mailing list
> [email protected]
> https://opm-project.org/cgi-bin/mailman/listinfo/opm
_______________________________________________
Opm mailing list
[email protected]
https://opm-project.org/cgi-bin/mailman/listinfo/opm
_______________________________________________
Opm mailing list
[email protected]
https://opm-project.org/cgi-bin/mailman/listinfo/opm

Reply via email to