Hi All,

I would like to update the those new HA test cases into Test DB within today.

I will let you check it once I finished the update work.

Regards,

Kubi

From: Fu Qiao [mailto:fuq...@chinamobile.com]
Sent: Wednesday, November 15, 2017 9:11 AM
To: 'Georg Kunz' <georg.k...@ericsson.com>; 'Srikanth Vavilapalli' 
<srikanth.vavilapa...@ericsson.com>; Gaoliang (kubi) <jean.gaoli...@huawei.com>
Cc: 'wucaifu' <wuca...@chinamobile.com>; 'likaiyjy' <likai...@chinamobile.com>; 
'wangxuyjy' <wangxu...@chinamobile.com>; 'juan_qiu' <juan_...@tongji.edu.cn>; 
'lansizhong' <lansizh...@chinamobile.com>; 'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org>; 'Tony Yin' <14_...@tongji.edu.cn>; 'Yue 
Yuan' <yuan....@zte.com.cn>
Subject: 答复: [opnfv-tech-discuss] 答复: [availability]High Availability Project 
meeting on Oct. 18

Hi, all. I go through the vote and concluded 5 TCs with scores higher than 4 as 
the suggested TCs for F release.
The HA test cases is going with the Yardstick testcases as before, so I guess 
Kubi or Kanglin will work on the test API database. Right?
Thanks!

发件人: Georg Kunz [mailto:georg.k...@ericsson.com]
发送时间: 2017年11月15日 2:59
收件人: Fu Qiao <fuq...@chinamobile.com<mailto:fuq...@chinamobile.com>>; Srikanth 
Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>; 
'Gaoliang (kubi)' <jean.gaoli...@huawei.com<mailto:jean.gaoli...@huawei.com>>
抄送: 'wucaifu' <wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 
'likaiyjy' <likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 
'wangxuyjy' <wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>; 
'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 
'lansizhong' <lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 
'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>;
 'Tony Yin' <14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'Yue Yuan' 
<yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>
主题: RE: [opnfv-tech-discuss] 答复: [availability]High Availability Project 
meeting on Oct. 18

Hi all,

I added some comments and voted on the test cases. One remark: milestone 2 is 
on Friday and requires all new test cases to be registered in the test API 
database. Has this process already started for the newly considered HA test 
cases?

Best regards
Georg

From: Fu Qiao [mailto:fuq...@chinamobile.com]
Sent: Thursday, November 02, 2017 8:15 AM
To: Georg Kunz <georg.k...@ericsson.com<mailto:georg.k...@ericsson.com>>; 
Srikanth Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>; 
'Gaoliang (kubi)' <jean.gaoli...@huawei.com<mailto:jean.gaoli...@huawei.com>>
Cc: 'wucaifu' <wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 
'likaiyjy' <likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 
'wangxuyjy' <wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>; 
'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 
'lansizhong' <lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 
'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>;
 'Tony Yin' <14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'Yue Yuan' 
<yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>
Subject: 答复: [opnfv-tech-discuss] 答复: [availability]High Availability Project 
meeting on Oct. 18

Hi, all. According to the discussion yesterday, I reorganize the etherpad page 
and conclude the proposed test cases into 12 TC.
Please check the following link and propose your comments.
Meanwhile, please put +1 on test cases you suggest to work on first for F 
release. We will make the decision for F release plan based on this.
Please provide any comments and your suggestion onto the page before the end of 
next week. I will work on JIRA tast allocation after that.
Thank you!

https://etherpad.opnfv.org/p/HA_Testcases_F_Release



发件人: 
opnfv-tech-discuss-boun...@lists.opnfv.org<mailto:opnfv-tech-discuss-boun...@lists.opnfv.org>
 [mailto:opnfv-tech-discuss-boun...@lists.opnfv.org] 代表 Fu Qiao
发送时间: 2017年11月2日 14:33
收件人: 'Georg Kunz' <georg.k...@ericsson.com<mailto:georg.k...@ericsson.com>>; 
'Srikanth Vavilapalli' 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>; 
'Gaoliang (kubi)' <jean.gaoli...@huawei.com<mailto:jean.gaoli...@huawei.com>>
抄送: 'wucaifu' <wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 
'likaiyjy' <likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 
'wangxuyjy' <wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>; 
'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 
'lansizhong' <lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 
'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>;
 'Tony Yin' <14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'Yue Yuan' 
<yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>
主题: [opnfv-tech-discuss] 答复: [availability]High Availability Project meeting on 
Oct. 18

Hi, Greg. We had a short discussion about the test cases. We plan to continue 
the discussion on the etherpad. I will reorganized the page as several test 
cases, and invite the rest of the team to vote on the priority of test cases 
and decide which one should be worked on first for the F release.


发件人: Georg Kunz [mailto:georg.k...@ericsson.com]
发送时间: 2017年11月1日 20:18
收件人: Fu Qiao <fuq...@chinamobile.com<mailto:fuq...@chinamobile.com>>; Srikanth 
Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>; 
'Gaoliang (kubi)' <jean.gaoli...@huawei.com<mailto:jean.gaoli...@huawei.com>>
抄送: 'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 'Yue 
Yuan' <yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; 'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>;
 'Fan Yamei' <fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; 'Tony 
Yin' <14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'lansizhong' 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 'wucaifu' 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 'likaiyjy' 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 'wangxuyjy' 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>
主题: RE: [opnfv-tech-discuss] [availability]High Availability Project meeting on 
Oct. 18

Hi all,

I won’t be able to join today’s meeting, but I’d like to nevertheless raise a 
question for today’s discussion: Considering that [future] HA test cases are 
[suppose to become] part of the Dovetail/CVP test suite, they need to be rather 
“backend implementation neutral”. What I mean is that the OpenStack control 
processes which are being killed by the tests can for instance run natively or 
containerized etc. and the HA test cases need to match that.

I realize that there is the concept of different “attacker types” in Yardstick 
which may be used to address this. However, I am wondering – from a CVP 
perspective – if this requires to bring potentially different test case 
implementations and/or configurations into the Dovetail test suite.

Best regards
Georg

From: Fu Qiao [mailto:fuq...@chinamobile.com]
Sent: Tuesday, October 31, 2017 2:21 AM
To: Srikanth Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>; 
Georg Kunz <georg.k...@ericsson.com<mailto:georg.k...@ericsson.com>>; 'Gaoliang 
(kubi)' <jean.gaoli...@huawei.com<mailto:jean.gaoli...@huawei.com>>
Cc: 'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 'Yue 
Yuan' <yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; 'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>;
 'Fan Yamei' <fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; 'Tony 
Yin' <14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'lansizhong' 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 'wucaifu' 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 'likaiyjy' 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 'wangxuyjy' 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>
Subject: 答复: [opnfv-tech-discuss] [availability]High Availability Project 
meeting on Oct. 18

Hi, I just notice that the summer time is end this week in Europe. I guess that 
may have impact on our project meeting time. Please refer to my outlook 
invitation for the right time of our project call.
For people in China, it will still be 9:00pm on Wednesday.
Thank you!

发件人: Srikanth Vavilapalli [mailto:srikanth.vavilapa...@ericsson.com]
发送时间: 2017年10月31日 0:31
收件人: Georg Kunz <georg.k...@ericsson.com<mailto:georg.k...@ericsson.com>>; 
Gaoliang (kubi) <jean.gaoli...@huawei.com<mailto:jean.gaoli...@huawei.com>>
抄送: 'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 'Yue 
Yuan' <yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; 'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>;
 Fu Qiao <fuq...@chinamobile.com<mailto:fuq...@chinamobile.com>>; 'Fan Yamei' 
<fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; 'Tony Yin' 
<14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'lansizhong' 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 'wucaifu' 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 'likaiyjy' 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 'wangxuyjy' 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>
主题: RE: [opnfv-tech-discuss] [availability]High Availability Project meeting on 
Oct. 18

Thanks Kubi. Yes, we can discuss this further in this week’s HA meeting 
(Nov-1st).

Thanks
Srikanth

From: Georg Kunz
Sent: Sunday, October 29, 2017 12:29 PM
To: Gaoliang (kubi) 
<jean.gaoli...@huawei.com<mailto:jean.gaoli...@huawei.com>>; Srikanth 
Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>
Cc: 'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 'Yue 
Yuan' <yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; 'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>;
 Fu Qiao <fuq...@chinamobile.com<mailto:fuq...@chinamobile.com>>; 'Fan Yamei' 
<fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; 'Tony Yin' 
<14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'lansizhong' 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 'wucaifu' 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 'likaiyjy' 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 'wangxuyjy' 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>
Subject: RE: [opnfv-tech-discuss] [availability]High Availability Project 
meeting on Oct. 18

Hi Kubi,

Thank you very much for creating the slide deck. This is very helpful.

Regards
Georg


From: Gaoliang (kubi) [mailto:jean.gaoli...@huawei.com]
Sent: Friday, October 27, 2017 8:35 AM
To: Srikanth Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>
Cc: 'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 'Yue 
Yuan' <yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; 'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>;
 Georg Kunz <georg.k...@ericsson.com<mailto:georg.k...@ericsson.com>>; Fu Qiao 
<fuq...@chinamobile.com<mailto:fuq...@chinamobile.com>>; 'Fan Yamei' 
<fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; 'Tony Yin' 
<14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'lansizhong' 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 'wucaifu' 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 'likaiyjy' 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 'wangxuyjy' 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>
Subject: RE: [opnfv-tech-discuss] [availability]High Availability Project 
meeting on Oct. 18

Hi Srikanth,

Thanks for your email

I went through the etherpad page of HA test case Fraser Planning,  It looks 
good.  Yardstick Fraser planning[3] is also on going. We already plan to sync 
the requirement from HA Team.  I would like to join the next HA meeting to 
discuss more detail about further HA test cases.

What I did is to following the action point of Test WG weekly meeting[1], I 
briefly summarized the existing HA test cases in Yardstick repo and make a 
slide[2] to  introduce HA testing to Openstack QA team, because they also would 
like to do some “ destructive testing” in Openstack community.  I guess Georg 
is the key person to connected with Openstack QA team.

[1] 
http://ircbot.wl.linuxfoundation.org/meetings/opnfv-testperf/2017/opnfv-testperf.2017-09-28-15.00.html
[2] 
https://wiki.opnfv.org/pages/viewpage.action?pageId=5734608&preview=/5734608/13206674/HA%20testing%20in%20Yardstick%20v0.6.pdf
[3] https://etherpad.opnfv.org/p/yardstick_release_f

Regards,
Kubi
发件人: Srikanth Vavilapalli [mailto:srikanth.vavilapa...@ericsson.com]
发送时间: 2017年10月27日 2:49
收件人: Georg Kunz <georg.k...@ericsson.com<mailto:georg.k...@ericsson.com>>; Fu 
Qiao <fuq...@chinamobile.com<mailto:fuq...@chinamobile.com>>; 'Fan Yamei' 
<fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; 'Tony Yin' 
<14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'lansizhong' 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 'wucaifu' 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 'likaiyjy' 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 'wangxuyjy' 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>; Gaoliang (kubi) 
<jean.gaoli...@huawei.com<mailto:jean.gaoli...@huawei.com>>
抄送: 'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 'Yue 
Yuan' <yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; 'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>
主题: RE: 答复: [opnfv-tech-discuss] [availability]High Availability Project 
meeting on Oct. 18

+kubi

Hi Kubi

I am referring to this e-mail thread in today’s test-wg call and here is the 
link to etherpad: https://etherpad.opnfv.org/p/HA_Testcases_F_Release where we 
are collating the High Availability test scenarios that we wanted to target for 
F release. As I understood from today’s call that you are also doing the 
similar exercise (by collecting inputs from OpenStack QA project and other 
sources) and it would be good if we can combine all these findings into the 
above etherpad.

Thanks
Srikanth

From: Georg Kunz
Sent: Wednesday, October 25, 2017 2:40 AM
To: Fu Qiao <fuq...@chinamobile.com<mailto:fuq...@chinamobile.com>>; 'Fan 
Yamei' <fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; 'Tony Yin' 
<14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'lansizhong' 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 'wucaifu' 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 'likaiyjy' 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 'wangxuyjy' 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>; Srikanth 
Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>
Cc: 'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 'Yue 
Yuan' <yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; 'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>
Subject: RE: 答复: [opnfv-tech-discuss] [availability]High Availability Project 
meeting on Oct. 18

Hi,

Ok, this gives us a bit more time for polishing the input on the the etherpad. 
Please note, that Nov 1st is a public holiday in Germany and that I most likely 
will not make it to the meeting. Srikanth will certainly (hopefully?) cover for 
me.

Best regards
Georg

From: Fu Qiao [mailto:fuq...@chinamobile.com]
Sent: Wednesday, October 25, 2017 4:34 AM
To: Georg Kunz <georg.k...@ericsson.com<mailto:georg.k...@ericsson.com>>; 'Fan 
Yamei' <fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; 'Tony Yin' 
<14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'lansizhong' 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 'wucaifu' 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 'likaiyjy' 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 'wangxuyjy' 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>; Srikanth 
Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>
Cc: 'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 'Yue 
Yuan' <yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; 'opnfv-tech-discuss' 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>
Subject: 答复: 答复: [opnfv-tech-discuss] [availability]High Availability Project 
meeting on Oct. 18

Hi, Georg. No HA meeting plan for today. I will go through the etherpad page 
about the test cases. I suggest we have another project meeting next week at 
same time to discuss about the F release plan.
@Greg, could you please give some updates on the HA API work on the next call? 
Especially about your plan for the F release. I would like to make out whether 
we can get some progress on this in the next release.
@Kanglin & Qiujuan, please go through the etherpad page and provide your 
comments about the suggested test cases. I would like to have a discussion on 
this on our next call and make out how many cases we can work out for the next 
release.
Thank you!

发件人: Georg Kunz [mailto:georg.k...@ericsson.com]
发送时间: 2017年10月24日 23:37
收件人: Fan Yamei <fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; Fu 
Qiao <fuq...@chinamobile.com<mailto:fuq...@chinamobile.com>>; Tony Yin 
<14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; lansizhong 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; wucaifu 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; likaiyjy 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; wangxuyjy 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>; Srikanth 
Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>
抄送: juan_qiu <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; Yue Yuan 
<yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; opnfv-tech-discuss 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>
主题: RE: 答复: [opnfv-tech-discuss] [availability]High Availability Project 
meeting on Oct. 18

Hi all,

Sorry for the slow response. Thank you for creating the etherpad and posting 
your test case proposals there. I have added a few more test cases that we had 
in mind. Currently they are just slogans (i.e. not as detailed as the test case 
descriptions Yamei added).

Will there be a HA meeting tomorrow?

Thank you
Georg

From: Fan Yamei [mailto:fanya...@chinamobile.com]
Sent: Monday, October 23, 2017 9:52 AM
To: Fu Qiao <fuq...@chinamobile.com<mailto:fuq...@chinamobile.com>>; Tony Yin 
<14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; lansizhong 
<lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; wucaifu 
<wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; likaiyjy 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; wangxuyjy 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>; Georg Kunz 
<georg.k...@ericsson.com<mailto:georg.k...@ericsson.com>>; Srikanth Vavilapalli 
<srikanth.vavilapa...@ericsson.com<mailto:srikanth.vavilapa...@ericsson.com>>
Cc: juan_qiu <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; Yue Yuan 
<yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; opnfv-tech-discuss 
<opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>>
Subject: Re: 答复: [opnfv-tech-discuss] [availability]High Availability Project 
meeting on Oct. 18


Hi,all.  I have already updated the CMRI HA test cases on that etherpad page. 
Please check.

If any questions, please do not hesitate to contact me.

________________________________
Best Regards!
Yamei Fan

发件人: Fu Qiao<mailto:fuq...@chinamobile.com>
时间: 2017/10/20(星期五)09:02
收件人: Tony Yin<mailto:14_...@tongji.edu.cn>;Fan 
Yamei<mailto:fanya...@chinamobile.com>;lansizhong<mailto:lansizh...@chinamobile.com>;wucaifu<mailto:wuca...@chinamobile.com>;likaiyjy<mailto:likai...@chinamobile.com>;wangxuyjy<mailto:wangxu...@chinamobile.com>;Georg
 Kunz<mailto:georg.k...@ericsson.com>;Srikanth 
Vavilapalli<mailto:srikanth.vavilapa...@ericsson.com>;
抄送人: juan_qiu<mailto:juan_...@tongji.edu.cn>;Yue 
Yuan<mailto:yuan....@zte.com.cn>;opnfv-tech-discuss<mailto:opnfv-tech-discuss@lists.opnfv.org>;
主题: 答复: [opnfv-tech-discuss] [availability]High Availability Project meeting on 
Oct. 18
Hi, all. Below are the minutes for this week’s HA project call.
According to the call, I create an etherpad page for the F release planning for 
HA testcases. I think we can use this to collect the possible HA test cases we 
would like to work on for F release and future releases.
@yamei & Srikanth, would you please help add the test cases you talked about 
during the call into this page?
@all, please feel free to also add more test cases that you think should be 
include in our future releases.

https://etherpad.opnfv.org/p/HA_Testcases_F_Release

Here is also a link for the current HA testcases that we collected before.
https://wiki.opnfv.org/pages/viewpage.action?pageId=8684344


Minutes

1, Georg introduced the on-going work in the QA team of OpenStack. They are 
planning to work out some HA test cases. Georg suggested it will be good that 
they adopt the HA test cases developed by OPNFV.

2, Srikanth mentioned there are also some on-going work within Erricsson that 
they would also like to contribute to OPNFV. Basically includes the following 3 
HA test cases
VM migration
networking robustness of SDN controller
DC Gateway HA

3, Kang Lin and Qiu Juan introduced their plan for the F release. They original 
plan is to update the Gui and framework of HA testing in Yardstick. Detailed 
test cases are not decided yet. But they are quite open to suggestions and 
ideas for future test cases.

4, Yamei introduced the HA test cases in China Mobile, which they also have a 
team focus on developing automatic test cases and can contribute to OPNFV.

5, The team decide to create an etherpad page to collect the planned test cases 
for F release, and propose these work to the QA team afterwards.


发件人: 
opnfv-tech-discuss-boun...@lists.opnfv.org<mailto:opnfv-tech-discuss-boun...@lists.opnfv.org>
 [mailto:opnfv-tech-discuss-boun...@lists.opnfv.org] 代表 Fu Qiao
发送时间: 2017年10月13日 14:56
收件人: 'Tony Yin' <14_...@tongji.edu.cn<mailto:14_...@tongji.edu.cn>>; 'Fan 
Yamei' <fanya...@chinamobile.com<mailto:fanya...@chinamobile.com>>; 
'lansizhong' <lansizh...@chinamobile.com<mailto:lansizh...@chinamobile.com>>; 
'wucaifu' <wuca...@chinamobile.com<mailto:wuca...@chinamobile.com>>; 'likaiyjy' 
<likai...@chinamobile.com<mailto:likai...@chinamobile.com>>; 'wangxuyjy' 
<wangxu...@chinamobile.com<mailto:wangxu...@chinamobile.com>>; 'Georg Kunz' 
<georg.k...@ericsson.com<mailto:georg.k...@ericsson.com>>
抄送: 'juan_qiu' <juan_...@tongji.edu.cn<mailto:juan_...@tongji.edu.cn>>; 'Yue 
Yuan' <yuan....@zte.com.cn<mailto:yuan....@zte.com.cn>>; 
opnfv-tech-discuss@lists.opnfv.org<mailto:opnfv-tech-discuss@lists.opnfv.org>
主题: [opnfv-tech-discuss] [availability]High Availability Project meeting on 
Oct. 18

Hi, all.
I would like to arrange a project meeting to start the discussion about HA test 
cases development for F release and future releases.
I would like to invite my colleague Fan Yamei to introduce the current high 
availability test cases in our specification, which we also plan to develop 
automation solutions and contribute to the community.
Would Kanglin and Qiujuan also give an brief introduction about your plan of 
the HA testcases for F release?
We would also like to coordinate with the Dovetail team to see if the plan can 
fit into the dovetail testing plan.
Detailed agenda is as below. Talk to you all at our regular time next Wednesday.

Next Meeting on 13:00-14:00 UTC, Wednesday, Oct. 18

https://global.gotomeeting.com/join/391235029



Toll free NO.

USA: +1 (571) 317-3116



Meeting ID: 391-235-029

Agenda:

HA test case in China Mobile – Fan Yamei

HA test case plan for F release – Kanglin

_______________________________________________
opnfv-tech-discuss mailing list
opnfv-tech-discuss@lists.opnfv.org
https://lists.opnfv.org/mailman/listinfo/opnfv-tech-discuss

Reply via email to