Hi frns,

   please send your updated resumes along with the details Rate/hr,
Location, contact number to  [email protected]



*Position: sharepoint developer/administrator*

*Location: ohio*

*Duration: 3-6  months*



Demonstrated ability to architect, design and deliver a SharePoint
infrastructure, which requires an extensive end-to-end knowledge of
SharePoint including the interconnecting pieces.  Specific technical skills
and experience include:



Skills to install, configure, tune, apply patches, troubleshoot and support
SharePoint Portal Server, Windows SharePoint Services, and integrated third
party applications.

Knowledge of Microsoft Windows Server 2003, Internet Information Server,
Active Directory, Microsoft Clustering, Windows Load Balancing, and DNS.

Experience with Microsoft SQL Server including web and database server
management and security.

Knowledge of HTML, XML, JavaScript, Visual Studio, VBScript, PERL, and .NET
Understanding of SharePoint site administration and permissions structure
Ability to manage governance polices and permission groups.

Ability to centrally administer search settings and site creations.

Ability to deliver SharePoint backup/recovery and disaster recovery
solutions.* *

*Background:*
multiple Sharepoint (SP) environments including a 2003 SP enterprise
environment, a 2007 SP MOSS enterprise environment, a Project Portfolio
Management environment, a Caseworks environment, and a PI environment.

 existing technical support staff for these environments has very limited SP
experience and they are directing their efforts to keeping the SP
environments operating.

*Contractor Duties:*  The contractor will addressing the items below.

Additional needs that require attention of SP experienced support staff
include:
a) migration of Transmission Operations site from SP 2003 to SP 2007 MOSS;
b) rebuild of SP 2003 environment to remove unlicensed installation of 2007
MOSS components;
c) resolution of  Sharepoint audit findings by identifying and implementing
access control reporting tools in the SP 2003 and SP 2007 MOSS environments;
and,
d) resolution of the inability to restore the Caseworks environment from
backup.

The client needs to establish a stable and sustainable Sharepoint
environment.  The current SharePoint environments are not healthy and need
significant work to achieve stability and sustainability for our customers.
 A 2009 audit of the Sharepoint environment identified multiple findings
needing prompt attention and requiring technical knowledge to resolve
effectively.


-- 


*Thanks and Regards,*
Sandeep .A
Agile Enterprise Solutions, Inc || "Ensuring Client's Success"||
Ph: (630)-219-0302 x 402
Fax: 847.890.6357
www.agilees.com|| Email: [email protected]
| If you have received this mail in error or prefer not to receive such
emails in the future, please reply with "REMOVE" in the subject line and the
email id(s) to be removed. All removal requests will be honored ASAP. We
sincerely apologize for any inconvenience caused

--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"Oracle-DBA-OCP" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.co.in/group/Oracle-DBA-OCP?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to