Hi All
We are in the process of migrating our database
from 7.3.4.5 to 8.1.6.3.
We are using a Sun Cluster (2 E4000 each with
4x480Mhx processors and 4gb Ram) for our system which is almost
24x7. This whole operation must be performed (ideally) within a maximum of 24
hour period (during say a national holdiday). Our database is approx 100Gb
large.
Any suggestions on how to do this operation? Any
past experience?
TIA