>Hi all,
>
>I have used the dbms_job package in some cases.
>Normally I use the INTERVAL
>method of the packages. i.e. 30 sec.
>
>But....
>
>soemtimes it occurs, that users change their system
>time to the future to
>test something,
>then changing back to the correct time.
>
>The INTERVAL job then stops, as he has not reached
>his "future" time......
>
>any ideas to handle this ?? (Oracle 7.3.4.1 on NT4)
>
>
>TNX
>
>> Frank <

Except forbidding your users to play with time, I don't see any 'clean' way to do 
this. Basically a job runs and INTERVAL is used to compute the next time when it must 
run. Job processes wake up periodically and check the system current time against 
this. If the current time and the previous computation are incoherent, you are done. 
The best you can do is perhaps a (manually executed) SQL script which checks whether 
times in DBA_JOBS make sense.

HTH,

Stephane Faroult
Oriole
-- 
Please see the official ORACLE-L FAQ: http://www.orafaq.com
-- 
Author: Stephane Faroul
  INET: [EMAIL PROTECTED]

Fat City Network Services    -- (858) 538-5051  FAX: (858) 538-5051
San Diego, California        -- Public Internet access / Mailing Lists
--------------------------------------------------------------------
To REMOVE yourself from this mailing list, send an E-Mail message
to: [EMAIL PROTECTED] (note EXACT spelling of 'ListGuru') and in
the message BODY, include a line containing: UNSUB ORACLE-L
(or the name of mailing list you want to be removed from).  You may
also send the HELP command for other information (like subscribing).

Reply via email to