Title: Message
Reformating chart as came out really bad in e-mail....
 
Activity----Start---End---Elapsed---Elapsed----Elapsed--Prorated--Prorated
------------Time----Time--Minutes---Mutlitask--Single---Multi-----Minutes
------------------------------------Minutes----Minutes--Minutes
1-----------10:00---12:00--120------060---------60------25--------85
3-----------11:00---13:00--120------120----------0------55--------55
4-----------11:30---13:30--120------090---------30------40--------70
7-----------13:30---16:00--150--------0--------150-------0-------150
 
 

Here is the scenario:

      Elapsed minutes refer to the actual �clock� time either spent on a given task.  Thus an activity that started at 9:00 am and finished at 11:00 am on the same day is said to have 120 elapsed minutes.

      If one task overlaps another (either completely or partially with another task), then the tasks are said to be �multitasked�.  In that case the system will store the portion of the elapsed time that was multitasked as �elapsed multitask minutes� and the portion of the time that was not overlapped as �elapsed single minutes�.  In addition, for the portion of time that two or more activities were simultaneously taking place; their time will be divided by the number of simultaneous activities and stored as �prorated multi minutes�.  The sum of Elapsed Single Minutes and Prorated Minutes will equal the actual clock time that a vehicle was active.

      The following example should help to illustrate these concepts.  In the table below a list of fictitious activities for a vehicle are shown in addition to how the time is allocated to the various measures:

Activity        Start Time      End Time        Elapsed Minutes Elapsed Multitask Minutes       Elapsed Single Minutes  Prorated Multi Minutes  Prorated Minutes       
1       10:00   12:00   120     60      60      25      85     
3       11:00   13:00   120     120     0       55      55     
4       11:30   13:30   120     90      30      40      70     
7       13:30   16:00   150     0       150     0       150    
Totals                  510     270     240     120     360    
The vehicle was active from 10:00 to 16:00, a total of 6 hours (360 minutes) which is equal to the total of Prorated Minutes.

      The vehicle performed 8 � hours (510 minutes) of work during that 6-hour time span.  This can be arrived at by adding the total of Elapsed Multitask Minutes (270) + the total of Elapsed Single Minutes (240).

Reply via email to