*Please send  resumes to [email protected]***




Hi,



Hope you are doing great,



This is *Aravind *from* EZEN Computer Services Inc* , Please do let me know
if you have anyone for the below requirement, if yes, kindly reply me back
with your updated resume in word format, contact information, current
location, visa status and rate.



*HPC Inventory and Analysis  *

* *

*Location:      Newark, NJ*
*Travel & Expenses:  Yes*

*Duration : 3 months

*


*The HPC Inventory and Analysis will include*

• A *inventory* of *grid/HPC* environments currently in use by the customer;

• An *inventory* of applications utilizing *grid/HPC* environments;
• The importance to and impact on *Prudential’s business* of each
*grid/HPC*application, based on priorities provided by you;
• Specific requirements for each *grid/HPC* application, including
software/hardware requirements and applicable business and/or regulatory
requirements
• Current utilization of each application, including *grid/HPC* capacity
requirements at baseline, typical, and peak utilization;
• Expected or anticipated growth in the utilization of
*grid/HPC*applications and environments;
• Comparable industry benchmarks and recommended practices regarding the use
and implementation of *grid/HPC* platforms and applications within the
financial services industry (where industry comparable data is publicly
available)

The second phase of the project involves design of a proposed *HPC
architecture*, based on the *Microsoft HPC platform*, which will support
current *grid/HPC applications* and utilization as well as provide a basis
for future expansion and scale.  The deliverable for this phase of the
project will be the *HPC Architecture Report*.

*The HPC Architecture Report will include

*• A stochastic capacity and utilization analysis incorporating baseline,
typical, peak, and temporal utilization;
• Anticipated utilization growth and attendant capacity requirements;
• Opportunities for consolidation of *HPC resources* among business units or
applications;
• Overall software/hardware and infrastructure requirements, specifically
the number of *compute nodes*, *compute cores*, *independent* and *isolated
networks*, and management requirements to support existing and future
*HPC*utilization;
• A proposed *HPC infrastructure design* incorporating sufficient operating
capacity and fault-tolerance to support current and anticipated
*HPC*utilization, based on the capacity analysis and growth
expectations noted
above.
• Documented Industry Recommended practices and prescriptive guidance for
scheduling and operational management of a large, shared/cross-lob
*HPC *environmentin
a Microsoft based solution.  This will be restricted to the Microsoft
specific parts of



* *

**Please feel free to call or mail for further details, thanks and Have a
great day.



Thanks & Regards
*Aravind*

*EZEN Computer Services Inc*, “Leading by Innovative Thoughts"
Ph: 609-945-3178
Email:* [email protected] ***

*www.e-zencomp.com*

-- 
You received this message because you are subscribed to the Google Groups 
"Oracle-Projects" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/oracle-projects?hl=en.

Reply via email to