Hello,
Greetings, please find the requirement's below that has just opened up. Do
send me your updated resume along with your contact details (Either
consultant or employer)
Candidate must have all the skills required for this position.
Location:Appleton,WI
Locals to WI/Chicago only.
Testing Objectives:
* Timely scheduling of various teams, so that testing may be
conducted, revisions (default resolution) made, and retesting occurs within
a given timeline.
* Affinity develops a formalized "user acceptance" process used to
determine/satisfy contractual obligations.
* Ensure effective workflow.
* Defects at go-live will be known so that work-arounds can be
identified.
* Verification that new functionality works as designed.
* Verify that all AMG specified EHR content in the 'templates/forms'
has been included in Centricity EMR.
Testing
In Scope:
* Pilot Implementation at initial Medical Home sites (Koeller Internal
Medicine, Oshkosh; Kaukauna Family Practice)
* Centricty EMR and Centricity EMR Test environment
* Potential of an evaluation of automated testing tools
* Development and implementation of a database (QMT) to trace
requirements, test cases, test results, and defect tracking.
* Development of test data repositories to be used by test teams for
the pilot project and in the future.
* Collection and refinement of requirements to be stored in QMT.
* Development and implementation of test cases for all phases of
testing and stored in QMT.
* Coordination and implementation of
* Module / Unit Testing
* 'Sub-system'/integration testing
* Patient simulation/system testing.
* User Acceptance Testing
Out of Scope:
. All sites beyond the pilot implementation.
. Implementation of automated testing tools.
. Release management testing of future Centricity EMR enhancements.
. Interface testing will be conducted by the Interface project and
is out of scope for this testing plan, with the exception of testing new
enhancements.
* Orion Rhapsody Interface engine testing will be conducted by the
Interface project and is out of scope for this testing plan.
. Infrastructure testing is out of scope.
. Clinical usability testing is out of scope.
. Data PreLoad testing will be conducted by the EHR Data PreLoad
project and is out of scope this testing plan.
. The creation of a training environment is out of scope.
Thanks & Regards
Karen l Computer Power group Inc l [email protected] l www.cpg-inc.com
Office: (262)-432-2543 Mobile: (262)-271-4722 Fax: (262)-364-2452
--
You received this message because you are subscribed to the Google Groups
"Oracle Users" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to
[email protected].
For more options, visit this group at
http://groups.google.com/group/oracle-users?hl=en.