Hi All,
My home machine is a 4 core 8 thread i7-960. I have allowed Vmware to take all 4 cores. However even when all CPU cores for the VM are loaded at 93% on all cores the host machine's CPU is only loaded at 60%. Does anyone know of any ways to make the Host PC take on more load ? Thanks, Tom
