Hi!

The business decided to change the content of our relase close to deadline.
* Now we have to remove developed functionality from our branch (restore it
to previous version)
* Develop and release new stuff
* Re-add the removed functionality.

1. How would you all do this operation?

More info:
We did a test shot and did not manage to get the results we wanted.
It was pretty much along the lines of
* Branch developed functionality to a backup branch
* Rollback to a previous version by version-label

After the rollback we wanted to be sure that the latest version in our
release-branch would be similar to the desired version-label in the same
branch. We did a comparison and there where differences. Allthough, we got
no differences when getting both versions to different workspaces and
comparing them with Beyond Compare

Any ideas?
Thanks!
/Mike
_______________________________________________
oztfs mailing list
[email protected]
http://prdlxvm0001.codify.net/mailman/listinfo/oztfs

Reply via email to