Hi Packmans, due to major reconstruction in the power network in my hosting institution there may be interruptions in PMBS availability for the upcoming days, starting today, until Tue, Sep 8th, including.
I moved all equipment to a data room not directly affected by the power interruptions, but side effects may harm this building, too. Also, the network uplink path is run through affected buildings. We planned ahead by re-routing traffic through data rooms, where there is a substitution power supply, but there still may be problems popping up, of which we did not think of. Additionally it might be, that I cannot reply by mail, as my SMTP relays are using the devices placed alongside PMBS, so I would have to reconfigure my mail setup in event a I am pretty sure, that there will be no interruption of PMBS, but please be warned. Greetings, Stefan -- Stefan Botter zu Hause Bremen
signature.asc
Description: This is a digitally signed message part.
_______________________________________________ Packman mailing list [email protected] http://lists.links2linux.de/cgi-bin/mailman/listinfo/packman
