Holger Klawitter <[EMAIL PROTECTED]> writes:

> For platinum certification a program has to last 1,000,000 gremlins.
> 
> Someone wrote somewhere that 30,000 Gemlins are normally enough to spot
> a bug, which seems to be true for most GUI bugs. 

I think 30,000 is too low, but 100,000 is fine. The Platinum test
actually ran a series of 10 gremlins to 100,000 events each, for a total
of 1,000,000.

I was unaware of this when we submitted our first app to Platinum, so I
picked 2 or 3 gremlins and ran them each to 1,000,000 events. It turns
out that there was an obscure bug in the app that actually caused about
20% of gremlin runs to fail, usually within the first 10,000 events. I
got lucky on the two I picked, and the bug didn't get tickled. The
Platinum people tickled the bug on the very first gremlin they ran :-(

For re-submission, I did a run of 100 gremlins to 100,000 to make sure
that none of them crashed.

-- 
Dave Carrigan ([EMAIL PROTECTED])            | Yow! Boys, you have ALL been
UNIX-Apache-Perl-Linux-Firewalls-LDAP-C-DNS | selected to LEAVE th' PLANET in
Seattle, WA, USA                            | 15 minutes!!
http://www.rudedog.org/                     | 

-- 
For information on using the Palm Developer Forums, or to unsubscribe, please see 
http://www.palmos.com/dev/tech/support/forums/

Reply via email to