Hi All,

   After creating a white space network a master device may want to change 
location, frequency, bandwidth or transmit power, and by regulation receive 
permission from the database before transmitting with the changed information.

   OFCOM has approved requirements to cover the cases where WSDs request to 
change their operation. 3.24 applies to changes from previously approved 
transmissions as well.

3.24

Prior to transmission in the UHF TV band, a master WSD must request from an 
approved WSDB the relevant instructions and parameters outlined in 3.23 
pertaining to itself, and where appropriate, to its served slave WSDs.

PAWS usecases requirements 1.2.1 In-Scope should add the modify operation items:
6. Request operation with transmission changes from those last acknowledged to 
the database in step 5.
7. Receive in response permission to operate with the modified transmission 
items
8. Send an acknowledgement to the database with information containing new 
operation parameters.

Similarly, Use Case 4.1 should be expanded to include operation with modified 
operation parameters.

Best Regards,

petere
Peter Ecclesine, Technology Analyst
MS SJ-14-4 170 West Tasman Dr, San Jose, CA 95134-1706
Ph 408/527-0815, FAX 408/525-9256
"Time doesn't fool around."  "Without Prejudice" U.C.C. 1-207


_______________________________________________
paws mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/paws

Reply via email to