I just want to be able to run a test suite with a switch that makes the entire test run stop after the first failure is reported.


-------------------------------------------------------
Matisse Enzer <[EMAIL PROTECTED]>
http://www.matisse.net/  - http://www.eigenstate.net/



Reply via email to