I am using PB6.5 with PFC and am having problems with validation. 

Does any one know where I can find additional information on how this works
in a data window. I would like the validation to take place as changes are
being made and to be checked  also when the data window is being saved.  It
seem to be called in the save process but after the SQL is sent to the
database. I would like it to be before the SQL is sent. The online books
aren't very helpful and the two PFC books (PB Foundation Class Library and
PFC Programmer's Reference Manual) I have doesn't say much of anything about
it either.

Thanks


joe r zehrung
ph: 925-246-5982
dsn: 350-5982
e-mail: [EMAIL PROTECTED]
We need a reason to speak, but none to keep silent.
"The Future is something which everyone reaches at the rate of sixty minutes
an hour, whatever he does, whoever he is." C. S. Lewis

> [EMAIL PROTECTED] HOSTED BY IIGG, INC. FOR HELP WITH LIST SERVE COMMANDS, ADDRESS
> A MESSAGE TO [EMAIL PROTECTED] WITH THE FOLLOWING MESSAGE:   help pfcsig
> SEND ALL OTHER INQUIRES TO [EMAIL PROTECTED]

Reply via email to