I have 9.1 running on 5432, and 9.2 running on 5433. The 9.1 database size
is 153g. 9.1 is actively used by systems, 9.2 is just sitting there empty.

I'd like to move the 9.1 database to 9.2 without any down time, and
ensuring that no data is lost.

My original idea was to make 9.2 a slave of 9.1, then switch it over.

Is there a better idea? Thanks for any tips.

-- 
Wells Oliver
wellsoli...@gmail.com

Reply via email to