In the 9.0.2 PG documentation that was posted concerning Julian dates, I noted 
that comments stated that Julian dates were used mainly for astronomical 
calculations.

I would like to let you know the importance of Julian dates in the ERP 
manufacturing sector.  In fact, here is how it is used.

In the factory, work and material scheduling, as well as material requirements 
planning usually refers to a manufacturing calendar. These calendars often have 
1000 working days to a manufacturing year. Using Julian dates in the software 
makes it easy to calculate target dates x working days after a given day. 
Calculations to take the Gregorian date, convert it to Julian, and then add a 
duration quantity before converting back, is where the use of the julian date 
shines. Calculations for differences between two dates is important and easily 
done.

I found the Julian date code that is programmed in Postgres, to be accurate and 
fast except for one situation. But, I do have one or two questions. 1) Which 
calendar is being used?   

In the Gregorian Calendar,  January 1, 0001 is lowest positive date.
The day before 1/1/0001, according to the Gregorian calendar is December 
31,-0001 in which the year has a value of negative one --- there is no zero 
year in the Gregorian Calendar. (zero year is an error)

I tested and found the algorithm in Postgres to have the day before January 
1,0001 calculating as December 31,0000 even though the world calculates the day 
before January 1,0001 as December 31,-0001.

2) Is the algorithm in Postgres correct?  I think not, as the calculations for 
the difference in days between January 1, 0001 and December 31,-0001 is not 367 
days, but just the value 1.

To convert the code to work with the Gregorian calendar takes two fixes to two 
sub-routines. Each fix is two lines of C code.

I have tested the PG Date C language routines with/without my fix, starting 
with the year around -4713 to several centuries into the future. As long as 
both versions calculate Julian dates that are later than 1/1/0001, both the PG 
and my fixed versions respecting Gregorian algorithms produce identical 
results. 

3) Does PG want to fully follow the Gregorian Calendar rule?  If so, 
4) do they want my one patch with two fixes6

Regards

Leslie  
(celebrating 40 years in IT).


-- 
Sent via pgsql-docs mailing list (pgsql-docs@postgresql.org)
To make changes to your subscription:
http://www.postgresql.org/mailpref/pgsql-docs

Reply via email to