Short list today ;)

### Last week:

   * [NewTools-Playground] polishing details and get it ready to test 
internally (which now is the case :P)
   * Documenting transmissions sub-framework. 
   * Spent a lot of time preparing integration of Spec2 0.6 into P9.

### This week (starting 2020-05-18):

- Finish 0.6 merge.
- Start working with NewTools-Inspector
- verify some errors in UFFI
- Gtk backend: verify some problems with low-level events

Reply via email to